Chapter 05 · The Places · Monterey County

ADU builder in Salinas.

If you live in Salinas, your home is built minutes from where it will sit. You can stop by the factory mid-build any time. $180K–$557K all-inclusive, with a permitting budget built in. Most homes are delivered in 4 to 9 months once permits clear.

Salinas Monterey Co. · 5 min from factory · Homes delivered

5 min from our Salinas factory

Approximate Salinas build neighborhood, never exact addresses.

Salinas ADU Rules

What applies on your lot.

1,200

ft² max · detached ADU

4 ft

min. side / rear setback

60-day

ministerial permit clock

1

parking space max, often waived

Sourced from Salinas's own published ADU standards. Full rulebook with citations →

Why Us for Salinas

We're local. Actually.

Our family-run team is based right here. Our factory sits in Salinas, 5 minutes from Salinas, and we have built across this region for years. When we say "local," we don't mean a sales rep who covers your area from somewhere else. We mean the people who design, build, and deliver your home are your neighbors.

That matters more than you'd think. When a planning department needs a clarification, we go in person. When an inspector flags something, we are there the same day. No phone tag, no road trips, no "we'll get back to you next week."

40+

years of building experience

5

minutes from our factory

4–9

months to keys

4.9/5

stars on Google

05 Our Local Team

Salinas Monterey County

From Our Families

Real families, real reviews.

“Everything we would have picked out was already in there.”
Richard & Maria · San Jose · 660 ft² · 1 Bed · Living closer to family

These are excerpts from real, verified Google reviews. Read more →

Salinas ADU FAQ

Questions about building in Salinas.

The answers below use Salinas's own published ADU standards, cited to official sources. For the full rulebook with citations, see our ADU Rules Lookup, the Monterey County ADU regulations guide, or the statewide California ADU laws 2026 overview.

How big can an ADU be in Salinas?

Detached ADUs are allowed up to 1,200 sq ft under state law. Cities may cap size lower, but never below 850 sq ft (studio or 1 bedroom) or 1,000 sq ft (2+ bedrooms). Smaller lots may also qualify for a Junior ADU (JADU) up to 500 square feet. Our 14 models range from 405 to 1,200 square feet, and your free property analysis confirms exactly which sizes your lot allows.

What are the setback requirements in Salinas?

4 ft from side and rear property lines for new construction (0 ft for a conversion within an existing structure). Front setback follows the main home's zoning. We confirm the exact setbacks for your specific lot during the free site visit (step 3 of our process).

Do I need to add a parking space?

At most 1 space per ADU, with broad exemptions: within a half mile walking distance of public transit, when replacing a garage, and for conversions. Most lots qualify for an exemption. We verify your lot's parking situation as part of the feasibility study.

How much are Salinas ADU permit fees?

Permit and impact fees vary by city, ADU size, and utility connections. Your project price carries a permitting budget built in, and we handle every submission for you. Exact fees are set by your city and county and are itemized in your feasibility study.

How far is your factory from Salinas?

Our factory is in Salinas, about 5 minutes from Salinas. We've delivered homes here and know the local conditions well.

Your Salinas Property

Let's see if your Salinas lot can host an ADU.

Our team will pull your property records, check setbacks, and tell you straight in about 30 minutes, free.

See If My Property Qualifies
BBB A+ 4.9 Google ReviewsCSLB #1047146MFG #1595931James Hardie® Siding