ADU Questions · 2026

ADU Impact Fees Explained

By Framework First· August 1, 2026· 5 min read

California ADU impact fees, the school, park, and traffic fees cities and counties charge to fund growth, are waived entirely for any ADU under 750 square feet. At 750 square feet or larger, the fees can’t be charged as a flat new-construction rate, they have to be proportional to the size of your primary home instead.

The short version: Under 750 sq ft, no impact fees. At 750 sq ft or larger, impact fees must scale with your primary home’s size, not the flat rate a new house would pay. This is separate from building permit and plan-check fees, which are set locally and scale with your project’s valuation.

What “impact fees” actually means

Impact fees are the charges a city or county collects specifically to offset the burden new housing places on public infrastructure. The most common categories are:

  • School fees, paid to the local school district
  • Park fees (sometimes called park dedication or quimby fees)
  • Traffic or transportation fees, sometimes called traffic impact mitigation fees

These are distinct from your building permit fee. Impact fees exist to fund infrastructure at a community level, and California’s ADU law places specific limits on how much of that burden can land on an ADU.

The 750 square foot rule, in full

California law is direct about this one:

ADU sizeImpact fee treatment
Under 750 sq ftImpact fees (school, park, traffic) are waived entirely
750 sq ft or largerFees must be proportional to the primary dwelling’s size, not a flat new-construction rate

The proportionality rule matters because before ADU law reformed this, some cities charged an ADU the exact same flat impact fee as an entire new single-family home, even if the ADU was a fraction of the size. That’s no longer allowed. If your ADU is 750 sq ft or bigger, the fee has to be calculated as a ratio of the ADU’s square footage to the primary home’s square footage, not treated as if you were building a brand new house from scratch.

Most of Framework First’s models land at or under 750 sq ft, which is part of why sizing matters so much in the early planning conversation, not just for construction cost, but for what it does to your fee exposure.

Impact fees are not the same as building permit fees

This is where a lot of homeowners get confused, and it’s worth being precise about.

Impact fees (school, park, traffic) are what’s discussed above, they’re subject to the state’s 750 sq ft waiver and proportionality rule.

Building permit and plan-check fees are a completely different bucket. These are set locally by each city or county’s building department, and they typically scale with your project’s construction valuation, not with a statewide waiver. Every jurisdiction sets its own schedule, and there’s no single statewide number to quote here, your local building department (or your feasibility study) will confirm the exact figures for your address.

So a homeowner building a 650 sq ft ADU might owe zero in school, park, and traffic impact fees, but still owe a building permit fee based on the construction valuation of the project. Both are real costs, but they’re governed by different rules and calculated differently.

Other jurisdiction-specific fees, utility connection fees, water or sewer capacity charges, and similar local charges, sit in their own category too, and vary the same way permit fees do: by city, by county, and sometimes by water or sewer district. If you want the full local picture, county-specific breakdowns like our guides to Monterey County ADU fees, Santa Cruz County ADU fees, and San Benito County ADU fees walk through what each area actually charges.

How this fits into building with Framework First

Framework First’s pricing already builds in a permitting budget, so you’re not chasing separate fee payments to the city on your own while your ADU is underway, though your exact permit and impact fee numbers are confirmed for your address during the feasibility study. During a feasibility study, we confirm the specific fee picture for your address and your chosen model size, including whether you land under or over the 750 sq ft impact fee threshold, before you’re committed to anything. If you’re still comparing sizes, our guide on how big an ADU can be in California and the broader permit timeline guide are good next stops.

Frequently asked questions

Do all ADUs under 750 square feet skip impact fees completely?

Yes, for the school, park, and traffic impact fee categories specifically. California law waives these entirely for any ADU under 750 sq ft, statewide. This doesn’t waive building permit fees or utility connection charges, which are set locally and apply regardless of ADU size.

If my ADU is exactly 750 square feet, does the waiver apply?

The waiver applies to ADUs under 750 sq ft. At 750 sq ft, you’re in the proportional-fee tier, meaning fees are calculated relative to your primary home’s size rather than waived outright. If you’re sizing a model near that line, it’s worth confirming the exact treatment for your project during a feasibility study.

Are impact fees the same everywhere in California?

No. The waiver and proportionality rules are statewide, but the actual fee schedules, and whether a city even charges school, park, or traffic fees in the first place, vary by city, county, and school or utility district. A feasibility study or your local building department can confirm what applies at your specific address.

Does Framework First handle impact fees for me?

Yes, in the sense that matters most: Framework First builds a permitting budget into every quoted price, so you’re not chasing a separate invoice from the city while your ADU is underway. Impact fees (waived under 750 sq ft) and building permit fees are set locally, so we confirm the exact fee picture for your property during the feasibility process, before you commit.

What if my ADU is a JADU instead of a standalone ADU?

JADUs are capped at 500 sq ft, so they fall well under the 750 sq ft impact fee threshold and are generally waived from these fees too. See our JADU vs ADU guide for how the two differ more broadly.


Want the exact fee picture for your property and your preferred model size? Start a feasibility study and we’ll confirm it before you commit to anything.

Talk to a Real Person

Have a question this didn't answer?

Our Account Managers and executives pick up the phone, not an offshore call center. Get a straight answer about your property in about 30 minutes, free.